Hapter, Rerequisites – Labconco Protector Stainless Steel Perchloric Acid Laboratory Fume Hoods 1308 Series Manuel d'utilisation

Page 10

Advertising
background image

Product Service 1-800-522-7658

6

Original instructions











C

HAPTER

2

P

REREQUISITES

Before you install your laboratory fume hood, you need to prepare your site for
installation. Carefully examine the location where you intend to install your
hood. You must be certain that the area is level and of solid construction. In
addition, a dedicated source of electrical power must be located near the
installation site.

Carefully read this chapter to learn the requirements for your installation site:

The location requirements.

The support requirements.

The exhaust requirements.

The exhaust washdown requirements.

The electrical power requirements.

The service line requirements.

The space requirements.


Refer to Appendix B: Protector Perchloric Acid Dimensions for complete fume
hood dimensions.

Refer to Appendix C: Protector Perchloric Acid Specifications for complete
laboratory fume hood electrical and environmental conditions, specifications and
requirements.

Advertising