5.4 Inspections to be performed prior to installation
TYPE OF CHECK
REQUIREMENT
VALUE /
VERIFICATION
Recommended: between +59 ° F and +77 ° F
(+15 °C and +25 °C)
1. Ambient temperature in the immediate
location of the equipment
Required: between +14 °F and +104 °F
(–10 °C and +40 °C)
2. Humidity and condensation
Verify that there is no water condensation or
dampness within the installation site
3. Ventilation
Verify that sufficient airflow or forced ventilation is
provided for battery cabinets location
4. Foundation and route to installation site
Verification of adequate structure, space and
clearance for dimensions and weights of the UPS
units and their battery cabinets
5.
When planning the location of the UPS
units, room for access to battery
cabinets and electrical boards is
critical.
Verify 16 in. (40 cm) clearance at rear for cable
connections and 39 in. (100 cm) at front for user
access and service
6.
Circuit breakers on the electrical board
supplying the system
Must be in accordance with Gamatronic system
specifications, connection schematic, and local and
national codes.
7.
Diameter of input and output power
cable connections, PE (Gnd) and
neutral lines.
Must comply with local and national codes, and be
appropriate for the circuit breakers protecting them.
Refer to connections schematic.
8.
Lightning / Voltage surge protection on
electrical board supplying the system.
Voltage surge suppressors type B are
recommended to be installed between each phase
and the neutral line:
Ratings: 150 Vac for 110-120 Vac mains.
Phase-to-Phase: 3x208* Vac, +15 %, -25 %
L1-L2
L2-L3
L3-L1
3-3 and 3-2
configuration
Phase-to-Neutral: 120* Vac, +10 %, -15 %
L1
L2
L3
Phase-to-Phase: 3x208* Vac Wye, +15 %, -25 %
L1-L2
9. Ac input voltage
2-2
configuration
Phase-to-Neutral: 120* Vac, +10 %, -15 %
L1
L2
10. Voltage between neutral and ground
0 – 2 Vac
11. System installation and start-up
Must be performed only by authorized personnel in
accordance with connection schematic, Gamatronic
system specifications and this User Guide
* Or other, according to nominal voltage rating of local power mains.