94 packaging and transportation, 1 scope of delivery, 2 transportation – Rinnai E110CP Manuel d'utilisation
Page 9

Installation & Servicing Instructions Rinnai E-Series
9
4
Packaging and transportation
4.1 Scope of delivery
The boiler is supplied ready for use.
•
Please check if the packaging is intact.
•
Check if all the items listed are included in the delivery.
The supply kit is contents:
!
CAUTION
4.2 Transportation
The boiler may be damaged when not secured properly.
- Only transport the boiler using appropriate transportation equipment, such as a
handtruck with a fastening belt or special equipment for maneuvering steps.
- When shipping the boiler must be secured on the transportation equipment to
prevent it from falling off.
- Protect all parts against impacts if they are to be transported.
- Follow the transportation markings on the packaging.
•
Packaged boilers must always be lifted and carried by two people, or you must
use a handtruck or special equipment for transport.
Description
E75C N
E75C P
E110C N
E110C P
Boiler with:
Outdoor reset sensor ARV12
1
1
Compression ring Ø22 brass
2
2
Compression ring Ø15 brass
4
4
Cover air supply Ш120/Ш80
1
1
Gasket vent system ø80
1
1
Power cable pull safety E-Series
1
1
Screw 4,8X16mm
4
4
Nut W1.1/8x1/14 22 Compression fitting
2
2
Screw 6X60mm
3
3
Lip-ring flue pipe ø80
1
1
Feed through + plug flue gas
1
1
Cap de-aerator
1
1
Flow restriction MR01 FG 7,6L white
1
Flow restriction MR01 FG 17,5L green
1
Adapter fitting 15mm x 3/4"NPT ext.
2
2
Nut 15mm compression fitting
2
2
Flue adapter Ш80/Ш3" pps UL appr.
2
2
Wall mounting suspension bracket
1
1
Plumbing kit E-Series
1
1
3/4" Gas valve
1
1
Line voltage input connector 3 pole grey
1
1
Template
1
1
Installation & Service Instructions
1
1
User information manual
1
1
Warranty document
1
1
ICSL book
1
1
Amount