10.0 Commissioning Procedure
1. l Fill and vent the system.
l
Open all valves fully and vent air from the heat exchanger.
l
Check for leaks at pipe connections.
2. l Refit the outer casing and secure with the 2 screws.
l
Switch on the electrical supply.
l
Check the operation of the unit by following the operating
instructions.
3. l Set up the installation parameters on the controls system
as necessary.
l
When installation and commissioning are complete, hand
over the instruction manual to the end user.