Installing ceiling enclosures above the fume hood, Installing rear panels behind the fume hood – Labconco Protector Stainless Steel Radioisotope Laboratory Fume Hoods 1208 Series Manuel d'utilisation

Page 39

Advertising
background image

Chapter 7: Modifying the Protector Radioisotope

Product Service 1-800-522-7658

35

Original instructions

Installing Ceiling Enclosures Above the

Fume Hood

Your Protector Fume Hood has mounting holes to accept a ceiling enclosure to
close off the area between the top of the hood and the ceiling. Contact Labconco
Customer Service for ordering information.













Figure 7-1

Installing Rear Panels Behind the Fume

Hood

Your Protector Fume Hood can be modified to add a rear panel behind the fume
hood when the fume hood is placed on an island (not available on Pass-Through
Fume Hood). Contact Labconco Customer Service for ordering information.

Installing Guardian™ Digital Airflow

Monitor or Guardian™ Airflow Monitor

The Guardian Airflow Monitors continuously monitor face velocity through the
fume hood opening. The fume hood right corner post is factory prepared to mount
either monitor. Contact Labconco Customer Service to order.

Sash Stop Kit – Field Installation

(P/N 9410300)

The sash stop kit restricts how far a vertical-rising sash may be opened. This small
plastic device may be easily field installed on the fixture corner post of any fume
hood.

Advertising