AKD-20 Low Voltage Switchgear
Chapter 4. Equipment Installation

38

©2012 General Electric All Rights Reserved

Outdoor Equipment

The recommended procedure for installing a switchgear equipment

supplied in an outdoor enclosure is as follows:

1. POSITION THE EQUIPMENT-Position the equipment or sections

of equipment in their final location. If the equipment line-up

was split into two or more shipping sections, it is necessary to

first match, line up, and reassemble the multiple sections into

one integrated equipment.


2. APPLY GASKET MATERIAL-After removal of the lifting plates

(see Fig. 4-6), it is necessary to apply the self adhesive gasket

material (6), Fig. 4-17, to the mounting surface of the roof

flange (5). The gasket material is supplied with the equipment.

3. ALIGN SECTIONS-Align the two sections with the mating

surfaces butted together.

4. FASTEN SECTIONS TOGETHER-Referring to Fig. 4-17, the

mating sections of the outdoor enclosure should be

immediately bolted together including the front (3) and rear (4)

vertical posts and the roof flange (5). Each vertical post will

require ten 3/8-16 x 1-inch bolt assemblies; the roof flange

will require either eleven or twelve 3/8-16 x 1/2-inch bolt

assemblies. The bolts should be tightened with a torque of

25-30 ft-lbs. Figure 4-18 is a cross-sectional view of the

assembled roof joint.

Fig. 4-17. Outdoor enclosure shipping split assembly