Installation – DCS 221712 Manuel d'utilisation

Page 17

Advertising
background image

15

INSTALLATION

2.

Install the two brackets to the chimney structure supplied with the kit by using one screw each
side.

3.

Join the two top sections of the duct cover.

Screw the two sections together with 8 screws (4 each side- see the top view in Fig. 16 for
joining the two sections).

4.

Install the top duct cover assembly to the bracket, near the ceiling, with two screws (one each
side).

Bracket

Duct cover
Top section

Duct cover
Top section

Bracket

Screw

Fix to the top

Top Duct
assembly
Diagram

Drive a #10 x 2-1/4"
screw into wood
framing above
ceiling. This screw
supports the load of
the upper chimney
duct cover. One
screw each side.

FIG. 16

Advertising