Installation – DCS 221712 Manuel d'utilisation

Page 11

Advertising
background image

9

INSTALLATION

HOOD INSTALLATION

1. Adjust chimney mounting structure to E + 3/8” dimension as determined in installation height

calculation on page 7. Use 2 screws per attachment leg, see Fig. 3.

2. To install Chimney Structure to ceiling, use a 10mm or adjustable wrench or flat head screwdriver.

a. Drill pilot holes into ceiling at fixing

points as determined in Step 6 under
Ceiling Preparation (Pg. 8).

b. Screw the 4 lag screws provided (see

Fig. 4, do not tighten completely).

c. Attach mounting structure to joists with

the 4 lag screws provided. (see Fig. 4,
keep 10” duct inside structure) .

ATTENTION: Junction Box on the chim

ney structure should be oriented to the

right side when facing the front of the

cooktop.

d. Tighten the 4 lag screws, see Fig. 4.

Junction
Box

Attachment
Leg

Fixing
point

Leg
screw

10" Duct

1/2" Conduit

Ceiling

Chimney
Structure

FIG.3

FIG.4

Advertising