Labconco Protector Pass-Through Laboratory Fume Hoods 1136 Series Manuel d'utilisation
Page 16

Chapter 3: Getting Started
Product Service 1-800-522-7658
12
Original instructions
Installing the Hood on a Supporting
Structure and Work Surface
The Protector Hood is heavy! Use caution when lifting or
moving the unit.
La Hotte Protecteur est lourd! Prudence en soulevant ou en
déplaçant l'objet.
!
When installing the Protector
Fume Hood onto a chemically-
resistant work surface or
benchtop, ensure that the
structure can safely support the
combined weight of the fume
hood and any related equipment.
The work surface should be at
least as wide as the hood to
properly support it. Position
front edge of fume hood 1.7"
past front edge of
worksurface. Lower base
cabinets or casework is
placed flush with front edge
of worksurface as shown in
Figure 3-2.
The work surface should be
smooth and durable, such as a
chemically-resistant epoxy
resin. The surface should be
nonporous and resistant to the
acids, solvents, and chemicals
used in conjunction with the
Protector Fume Hood. The
work surface should also
contain a dished recessed area
for containing primary spills.
Figure 3-2
33.4"
30.0"
1.7"
Both
Sides
35.8"
1.3"
59.0"
45.7"
26.5"