02 start-up sequence, 02 start-up sequence -2, Power – Tweco 20 O2 Auto-Cut Manuel d'utilisation
Page 68
Advertising

Manual No. 0-4816 Auto-Cut 200
2
4-2
OPERATION
4.02 Start-Up Sequence
1. Connect system to primary input power.
2. Turn ON/OFF switch to ON (up) position.
AC Indicator
turns ON after about 5 seconds.
POWER
ON
OFF
O
I
OFF
O
Art # A-04812
3. Check the AC indicator. If indicator is ON, system is ready to operate (pending fault checks by internal cir-
cuitry). If indicator does not light after a few seconds check that each inverter is correctly configured for the
input voltage and all 3 phases are present. Check Status Indicator for any codes that can help determine
problem.
Advertising