Installation introduction – Garland THE SUMMIT ELECTRIC CONVECTION OVEN Manuel d'utilisation
Page 6

Part # 1955204 Rev 2 (07/13/12)
Page 6
INSTALLATION
INTRODUCTION
Like any other fine, precision built appliance, your oven
should be given regular care and maintenance. Periodic
inspections by your dealer or a qualified service agency is
recommended.
Rating Plate
When corresponding with the factory or your local
authorized factory service center regarding service problems
or replacement parts, be sure to refer to the particular unit
by the correct model number (including the prefix and suffix
letters and numbers) and the warranty serial number. The
rating plate located on the lower rear of left side panel..
Clearances
Combustible and non-combustible wall clearances are: side,
1.0” (25mm) and rear, 3.0” (76mm).
NOTE: Adequate clearance must be provided for servicing
and proper operation.
Installation Of Ovens Equipped
With Casters
A. For an appliance equipped with casters, the installation
shall be made with a connector that complies with the
Standard for connectors for Movable Appliances, ANSI
Z21.69. Adequate means must be provided to limit the
movement of the appliance without depending on
connector wiring.
B. The front casters of the unit are equipped with brakes to
limit the movement of the oven without depending on
the connector wiring to limit the appliance movement.
C. The restraint can be attached to the unit near the
electrical inlet. If the restraint is disconnected, be sure to
reconnect the restraint after the oven has been returned
to its originally installed position.
Installation of Double Deck Models
A. Position insert in bottom leg opening and tap insert up
into leg until it seats at collar. Attach six inch (6”, 152mm)
legs to lower oven section. Raise unit or lay on its left side.
Place the front legs on the oven so as to line up with four
(4) attaching bolt holes. Secure leg to oven frame using
four (4) 3/8-16 x 3/4 bolts and washers provided. Repeat
at rear of unit.
B. Remove lower front cover of top deck (located under
oven doors). Raise top deck into place and line up body
sides and back of the unit. Fasten the rear of the units
together, with the stacking bracket, using (6) 1/4-20
machine screws, lock washers and nuts, (provided).
C. Install the interconnecting flue parts, carefully following
the instructions contained in the stacking kit. Pay
particular attention to the type of ovens you are stacking
and be sure to follow the corresponding instructions.
D. Check leveling of unit four (4) ways (using a common
carpenter’s level on the rack inside the oven).
E. Maintain clearance from combustibles.