English, Drain body installation faucet function – Pfister F-042-LT0K Manuel d'utilisation
Page 3

ENGLISH
(1*/,6+
8
9
11
12
7
10
7 SECURING FAUCET
)URP XQGHUQHDWK VLQN VHFXUH )DXFHW %RG\
7A) by placing Metal Washer (7B) and
threading Long Nut (
7
/
16
Hex.) (
7C) onto Mounting Post (7D). Make sure that the bumps
on Metal Washer (
7B DUH IDFLQJ XS )LUPO\ KDQG WLJKWHQ /RQJ 1XW 7C 6HFXUH /RQJ
Nut (
7C) not to exceed a 1/4 turn.
Caution: Do not over tighten!
8 WATER SUPPLY LINES
Gently separate hot and cold supply tubes (
8A), approximately three inches apart.
&RQQHFW ZDWHU 6XSSO\ /LQHV
8C WR )DXFHW ,QOHWV 8B). Hot water supply line goes to hot
LQOHW ¿WWLQJ LQGLFDWHG E\ UHG WDJ
8D 6XSSO\ OLQHV QRW LQFOXGHG )ROORZ PDQXIDFWXUHU¶V
instructions when installing supply lines.
10 POP-UP INSTALLATION
,QVWDOO DQG DGMXVW 3RS8S
10A) using separate instructions supplied with the Pop-Up
assembly.
9 POP-UP ROD CONNECTION
Insert Lift Rod (
9A LQWR KROH DW WKH EDFN RI )DXFHW %RG\ 9B).
11 UNIT START UP
Turn on hot and cold water supplies, and check for leaks above and below the sink.
12 VALVE FUNCTION
By lifting the Lever Handle (
12A XS WKH YDOYH ZLOO EH DFWLYDWHG DOORZLQJ ZDWHU WR ÀRZ
7KH ZDWHU ÀRZ ZLOO LQFUHDVH E\ FRQWLQXLQJ WR OLIW XS WKH /HYHU +DQGOH
12A). By rotating
WKH /HYHU +DQGOH FRXQWHUFORFNZLVH WKH ZDWHU WHPSHUDWXUH ZLOO GHFUHDVH WR FROG ÀRZ
only. By rotating the Lever Handle clockwise, the water temperature will increased to
KRW ÀRZ RQO\
Note: Flush faucet before turning on valve (
see step 13)
DRAIN BODY INSTALLATION
FAUCET FUNCTION
7B
7C
7D
7A
8B
8B
8C
8A
8C
8D
9A
9B
10A
12A
HOT
COLD
HOT
COLD
OPEN
12A
8A