Faber AXIA ISOLA Manuel d'utilisation

Page 5

Advertising
background image

Version 02/02 - Page 5

4. Determine and make necessary cuts for the ductwork.

The duct opening is shown on the mounting template (Item E

in Figure 5). Install ductwork before mounting the support.

5. Determine the proper location for the Power Supply

Cable as indicated on the template. Use a 1 1/4" Drill Bit to

make this hole. Run the Power Supply Cable. Use caulking

to seal around the hole. DO NOT turn on the power until

installation is complete! A knockout is provided near the

exhaust exit on the canopy for the Power Supply Cable.

6. Attach the Upper Support to the ceiling (Item A in

Figure 6). Make sure that the support is firmly attached to the

ceiling. Install the Lower Support (Item C in Figure 6). The

canopy height over the range is determined by the length of

the support. The bottom of the canopy will be approximately 2

5/8 inches below the bottom of the support. Once the length

of the support is determined, tighten the four screws using

an Allen Wrench (Item D in Figure 6) to secure the Lower

Support in place. All four screws must be firmly tightened

ATTACH THE SUPPORT

1. Put a thick, protective covering over cooktop, set-in

range or countertop to protect from damage or dirt.

2. Determine and clearly mark with a pencil on the ceiling

where the rangehood will be installed.

3. A template (Item A in Figure 5) for mounting the support

is supplied in the carton with the support. Use this template

to mark holes for support on the ceiling. The chimney must

be disassembled to reveal the support. The Upper Chimney

(Item B in Figure 5) is held in place by two screws which

must be removed.

FIGURE 6

FIGURE 5

before attaching the canopy.

7. Remove the cover from the field wiring compartment.

Remove the wiring electrical knockout using a flat-blade

screwdriver. DO NOT turn on the power until installation is

complete! Connect the Power Supply Cable to the rangehood.

Attach the White lead of the power supply to the White lead

of the rangehood with a twist-on type wire connector. Attach

the Black lead of the power supply to the Black lead of the

rangehood with a twist-on type wire connector. Connect

the Green (Green and Yellow) ground wire under the Green

grounding screw.

8. Attach the duct work to the top of the blower. Make

sure to seal all joints with duct tape to prevent leaks.

For ductless installations:

Ductless installations require a ductless kit. This kit consists of

one upper chimney cover with a hole for the exhaust air (Item

A in Figure 7), a vent grid to cover the hole in the chimney

cover (Item B in Figure 7), a ductless diverter assembly (Item

C in Figure 7), and two charcoal filters (Item D in Figure

7). The ductless diverter must be installedbefore the upper

chimney cover. The chimney cover without a vent hole will

not be needed for this installation and should be discarded.

Before installing the upper chimney cover, the vent grid

assembly must be installed. The bottom of this assembly

must attach to the blower (Item F in Figure 7). The upper

end must be positioned at the opening in the upper chimney

support (Item E in Figure 7). Install the ductless diverter

assembly. The charcoal filters will be installed after the

rangehood is completely installed.

FIGURE 7

INSTALL THE CANOPY

1. Remove the grease filters and set aside. The grease

filters are removed by pressing the handle in front of the filter.

When replacing, make sure the filters are properly positioned

with the handles visible in front.

IMPORTANT NOTE: BE CAREFUL

WHEN DETERMINING THE

LOCATION FOR THE HOLE IN

YOUR CEILING FOR THE DUCT

WORK. THIS HOLE SHOULD

NOT BE CENTERED OVER THE

CENTER OF THE COOKING

SURFACE AS THE DUCT WORK

THAT RUNS UP INSIDE THE

CHIMNEY AND THROUGH THE

CEILING IS NOT IN THE CENTER

OF THE CHIMNEY.

Advertising