Pre-installation checklist, Installation preparation – GE ZGU384NSMSS Manuel d'utilisation
Page 6
Attention! Le texte de ce document a été détectée automatiquement. Pour consulter le document original, vous pouvez utiliser le mode "Original".

Installation Preparation
PRE-INSTALLATION CHECKLIST
1.
When preparing cooktop opening, make sure
the inside of the cabinet and the cooktop do
not interfere with each other. (See section on
preparing the opening.)
2.
Slide the cooktop out of the end of the box.
Remove packaging materials, grate boxes,
regulator and literature package from the
cooktop before beginning installation.
• Use the shipping carton as a pad to protect
customer countertops or flooring.
3 .Remove Installation Instructions from literature
package and read them carefully before you
begin.
Be sure to place all literature. Owner's Manual,
Installations, etc. in a safe place for future
reference.
4. Make sure you have all the tools and materials
you need before starting the installation of the
cooktop.
5.
Your home must provide the adequate electrical
service needed to safely and properly use
your cooktop. (Refer to section on electrical
requirements.)
6. When installing your cooktop in your home, make
sure all local codes and ordinances are followed
exactly as stated.
7. Make sure the wall coverings, countertop and
cabinets around the cooktop can withstand heat
(up to 200°F) generated by the cooktop.
Regulator toped
Foam packaging
and right side grates