07 connecting torch leads, 07 connecting torch leads -4 – Tweco 100XL Plus CE PAK Master Manuel d'utilisation
Page 20

INSTALLATION
3-4
Manual 0-2813
3.07 Connecting Torch Leads
A. Connecting PCM-102 Torch or SL100 torch
with O2B Connectors
WARNING
Disconnect primary power at the source before
assembling or disassembling the power supply,
torch parts, or torch and leads assemblies.
The Torch Leads must be properly installed to the Power Sup-
ply for proper operation. Make all torch connections to the
Torch Bulkhead Panel as follows:
NOTE
Equipment ordered as a system will have the Torch
factory connected to the Power Supply.
1. Turn the screw latch securing the front access
panel to the power supply front panel.
Access
Panel
Screw
Latch
A-02467
Figure 3-3 Front Access Panel
2. Lift the access panel to gain access to the torch
bulkhead panel.
CAUTION
This system is designed for use with the PCM-102
Automated Torch or SL100 Torch only. Do not con-
nect any other torch to this power supply.
3. Remove the retaining nut from the Strain Relief.
Strain Relief
Nut
Strain Relief
Torch Leads
Assembly
A-02760
Figure 3-4 Torch Strain Relief Nut (PCM-102 Torch
Shown)
4. Feed the end of the torch lead and the Strain Relief into
the hole in the unit.
5. Tighten the Strain Relief Nut to secure the Strain
Relief to the Power Supply.
Adapter
(Supplied With
Power Supply)
Pilot Lead
Torch Lead
Assembly
Gas/Power
Lead
Adapter
Connector
Pilot Lead Stud
Gas/Power Lead
Connection
A-02747
PIP Circuit &
Shield Connectors
Figure 3-5 Torch Leads Connections (PCM-102
Torch Installation)