Installation, Final check lists – Blodgett CNV14G Manuel d'utilisation
Page 19

Installation
15
Final Check Lists
WARNING!!
Final check list must be performed by a
qualified installer only.
ELECTRICAL CONTROL COMPARTMENT
j
Voltage to appliance matches rating plate
PLUMBING FINAL CHECK - CNV14E ONLY
j
Incoming water pressure within appliances of
specification
j
Atmospheric vented drain in place
j
Water solenoid properly bracketed and not
leaking
j
Water feed lines intact without leaks
j
Optional Spray Hose connected properly.
Connect the optional spray hose to the fill soĆ
lenoid as shown.
To
Oven Fill
Manifold
Hose and Spray
Option
Cold Water Supply
Figure 9
OVEN OPERATIONAL TESTS
NOTE: Checks to be made by customer or authoĆ
rized service agent.
Cool Down Mode
j
Check that the fan runs with the door open.
Hot Air Mode
Turn to HOT AIR mode and set thermostat to
400_F (204_C) and verify:
j
Heat demand light is on
j
Oven is heating properly
j
Heat lights shuts off at 400_F (204_C) and
oven maintains 400_F (204_C).
j
Fan shuts off with door open.