Installation instructions – GE JV936DSS Manuel d'utilisation
Page 14

Alternate Mounting Method
INSTALL HOOD TO SOFFIT OR
BENEATH CABINETS
SKIP THIS STEP IF USING WALL MOUNTING METHOD
IMPORTANT : Soffit framing must be capable of
supporting 100 lbs.
When necessary the hood may be installed so that it is
supported by the soffit.
• The soffit should be constructed with 2x4’s.
• Determine the installation location..
• Continue the centerline forward on the bottom of the
cabinet or soffit.
• Mounting screws must be secured to 2 x 4 studs (Dim. “A”)
at locations shown in the above chart.
• Allow minimum opening (Dim. “B”) to accommodate
the duct transition in the soffit
Cut a 10-3/4” x 8-7/16” hole through bottom of soffit or
cabinet for duct transition as shown.
14
IMPORTANT : For additional support and to minimize
vibration during operation, we strongly recommend
that the hood also be secured to the back wall with wall
fastners.
• Drill four 1/8” pilot holes in locations show.
– If mounting to the underside of a cabinet with a
recessed bottom, install shims to fill the gap.
• Drive mounting screws int the studs until they
protrude 1/4”. This 1/4” gap will provide clearance to
engage the keyhole slots in the top of the hood.
• Lift hood onto mounting screws. slide back against
the rear wall.
• Pull house wiring through the knockout at the rear or
top of the hood.
• Tighten mounting screws.
4
Rear Wall
2-3/8”
5-3/8”
5-3/8”
8-7/16”
Top View, Front Side
30” Models
2-9/16”
7-1/16”
2-3/8”
10-3/4”
2-1/4”
14-1/2”
29-7/8”
14-1/2”
12”
8-7/16”
Top View, Front Side
B
A
A
Transition
1/4” Gap
Add
Shimms if
Bottom is
Recessed.
Cabinet
or Soffit
Back
Wall
Engage Keyhole Slots
and Push Back at Wall
Installation Instructions
2-9/16”
7-1/16”
2-3/8”
10-3/4”
2-1/4”
17-1/2”
35-7/8”
17-1/2”
12”
8-7/16”
Vue de dessus, partie avant
36” Models
“A”
Centerline to
Center of Stud
“B”
Opening for
Ductwork
30” Models
14-1/2”
10-3/4” W x 8-7/16 D
36” Nideks
17-1/2”
10-3/4” W x 8-7/16 D