Installation, Installer checklist – DCS BGB132 Manuel d'utilisation
Page 15
Advertising

13
INSTALLATION
INSTALLER CHECKLIST
■
Specified clearances maintained to combustibles.
■
Side burner is properly mounted.
■
All internal packaging removed.
■
Burner is seated properly and does not rock.
■
Each burner lights satisfactorily, individually or with adjacent burner lit.
■
Knob(s) turn freely. Bezel(s) centered.
■
Flame adjusted.
■
Pressure regulator connected and set for 4.0"W.C. Natural, 11.2"W.C. LP gas.
■
Manual shut-off valve installed and accessible.
■
Unit tested and free of leaks.
■
User informed of gas supply shut-off valve location.
■
Battery installed in module properly and generates ignition spark when activated.
PLEASE LEAVE THESE INSTRUCTIONS WITH THE USER.
USER, PLEASE RETAIN THESE INSTRUCTIONS FOR FUTURE REFERENCE.
Advertising