Service procedure, Specifications, Continued – Desa RCLP375 Manuel d'utilisation

Page 12

Advertising
background image

12

100165

SERVICE

PROCEDURE

Continued

21. Connect motor wires as

follows (see Figure 6,
page 10):
• white wire—to terminal

board.

Note:

Attach to

empty connector on white
wire side of terminal
board.

• red wire—to terminal

board.

Note:

Attach to

empty connector on black
wire side of terminal
board.

• blue wire—to thermal

switch wire

• blue wire—to solenoid

valve

• green wire—to grounding

screw on shell

22. Replace side cover.
23. Replace fan guard.

Model

Input Rating (kJ/Hr) (BTU/Hr)

Fuel

Fuel Consumption

Gallons/Hour

Pounds/Hour

Supply Pressure To Regulator

Minimum (for purposes of
input adjustment)
Maximum

Regulator Outlet Pressure

Motor

Electric Input

Amperage

Weight

Heater
Shipping

Size - L x W x H

Heater
Carton

RCLP375 and BCLP375

168.800 to 332.325 (160,000 to 315,000)

Propane Vapor Only

6,8 l/h min./13,6 l/h max.
(1.8 Minimum/3.6 Maximum)
3,35kg/h min./ 6,85 kg/h max.
(7.4 Minimum/15.1 Maximum)

172 kPa (25 psig)
1379 kPa (200 psig )

48 - 138 kPa (7-20 psig)

1700 RPM

120 V/60 Hz

3.0

18, 1 kg (40 lbs.)
21,8 kg (48 lbs.)

89 cm x 33 cm x 51 cm (35 in. x 13 in. x 20 in.)
94 cm x 40,5 cm x 53,5 cm (37 in. x 16 in. x 21in.)

SPECIFICATIONS