Part No. CJ520658 REV. C
2/2014
INSTALLATION INSTRUCTIONS
PAR Directional and
Directional Low Voltage
ROUGH-IN SECTION
for
DP, DMRH and DLV
SAVE THESE INSTRUCTIONS
PRIOR TO INSTALLATION
Read and familiarize yourself with the
nomenclature and instructions before
starting installation.
Turn off electricity at the breaker panel
or fuse box and follow National Electrical
Code regulations.
C
D B A
Figure 1
E
F
Figure 2
WOOD OR STEEL JOIST CONSTRUCTION
On 24” centers (16” or 24” O.C. for 4” fixture)
utilizing solid type (non-accessible) ceiling
(drywall, plaster, etc.).
USING ROUTER FOR CEILING CUTOUT
1.Open lever (C) securing bar hangers - bend
ends of hangers 90° (D) to be used as nailing
tabs, center in the vertical slot, and close le-
ver (C) to lock; repeat on opposite side. Refer
to Figure 1.
2.Secure a piece of plywood (E) to temporarily
span the bottom of the joists to support the fix-
ture housing while attaching the bar hangers
(F) to the joists. This will position the housing
correctly for drywall installer to provide pilot
hole (G) to locate fixture after ceiling has been
installed. Refer to Figure 2.
3. PROCEED TO “FEED WIRE
CONNECTION TO FIXTURE J-BOX” ON
NEXT PAGE
. Return and complete following
steps after feed wire connections have been
made.
4.Using 1/8” router follow outside of plaster
frame to cut hole in ceiling.
5.Loosen (2) 5/16” screws (A) 180° apart, al-
lowing fixture to drop down so bottom edge of
plaster flange will be slightly above edge of
ceiling material.
Upon receipt, thoroughly inspect for
any freight damage which should be
brought to the attention of the delivery
carrier. Compare the catalog description
listed on the packing slip with the label on
the carton to ensure you have received the
correct merchandise..
IMPORTANT SAFETY INFORMATION
For Your Protection, Read Carefully
WARNING - Risk of fire. Do not install
insulation within 3 inches of fixture sides
or wiring compartment, nor above the
fixture in such a manner as to entrap
heat.
A
B
Figure 3
Wiretie
Figure 4
T-BAR CEILING INSTALLATION
1. Install ceiling panel in t-bar with ceiling
opening precut. Ceiling opening must be
slightly larger than the outside diameter of the
plaster flange.
2. Open lever (A), expand bar hangers (B)
to approximately 24” and close lever to lock.
Refer to Figure 3.
3. Through an adjacent opening, position the
mounting frame with the plaster flange
passing through the precut opening with
the notches on the bar hangers engaging
the t-bar.
4.Secure the bar hangers to the t-bar by wire
or wiretie (by others) or bending end of bar
hanger. Refer to Figure 4.
5.Open lever and adjust mounting frame
vertically so that the bottom edge of the
plaster flange is flush or slightly above the
bottom edge of the ceiling panel.
6
. PROCEED TO “FEED WIRE
CONNECTION TO FIXTURE J-BOX” ON
NEXT PAGE.
7. If fine tuneadjustmentfrom below ceiling is
required: Loosen (2) 5/16” screws (A) 180°
apart, allowing fixture to drop down so
bottom edge of plaster flange will be
slightly above edge of ceiling material.
Refer to Figure 1.
1. Electric current can cause painful
shock or serious injury unless
handled properly. For your safety,
always remember the following:
·
Turn off the power supply.
·
Ground the fixture to avoid potential
electrical shocks.
·
Do not handle an energized fixture or
energize any fixture with wet hands,
when standing on a wet or damp
surface, or in water.
·
Double check all electrical connections to
be sure they are tight and correct.
2. Specific
safety
information
concerning lamps:
·
Match wattage of fixture and lamp
exactly.
·
Do not remove or insert lamp when
power is on.
·
Do not scratch glass or subject lamp to
undue pressure as either may cause
lamp breakage.
·
Protect operating lamp from sources
of moisture.
·
If lamp is marked
it contains
mercury. Follow disposal laws.
See: