Smith Cast Iron Boilers GVIOM-5R Manuel d'utilisation

Page 5

Advertising
background image

Page 5

GV100W BOILER

INSTALLATION & OPERATING INSTRUCTIONS

E

F

D

C

B

C

A

Clearances

A

B

C

D

E

F

Alcove

in

25

*

6

4

7

4

mm

635

*

152 102 178 102

Closet

in

25

2

6

4

7

4

mm

635

51

152 102 178 102

To Service

in

N/A

N/A

6

4

10

10

mm

N/A

N/A 157 102 254 254

* No front wall for alcoves.

FIG. NO. 1 Minimum Clearances to Combustible Construction

TABLE 1 Boiler Dimensions

Boiler Size

Dimension

Dimension

Vent Dia.

Vent Dia.

(# Sections)

A

B

CATEGORY I

CATEGORY III

Single Wall Galv.

Horizontal Vent

in

mm

in

mm

in

mm

in

mm

3

10

7

8

276

2

7

16

62

4

102

4

102

4

13

5

8

346

3

13

16

97

4

102

4

102

5

16

3

8

416

5

3

16

132

4

102

4

102

6

19

1

8

486

6

9

16

167

5

127

4

102

7

21

7

8

556

7

15

16

202

5

127

4

102

GAS VALVE

TEMP.
CONTROL

JUNCTION BOX,
CONTROL CENTER
& INDUCER RELAY

FRONT VIEW

A

2 11/16"

2 11/16"

FLAME
ROLL-OUT
SWITCH

6 1/2"

B

6 3/4"

13 1/4"

27 5/8"

5 5/8"

13 1/2"

11 1/2"

30"

GAS INLET

8 5/8"

PRESS.
SWITCH

INDUCER

(1)

(1)

(1)

(1)

(1)

(1)

(2)

(2)

(2)

SIDE VIEW

(2)

Notes: 1. Components located behind front panel
2. Vertical dimensions must be adjusted when using a base pan or concrete foundation under the boiler

18"

FIG. NO. 2 Boiler Dimensions & Component Locations

Advertising